Live demo
Try the margin check yourself.
This page runs the same margin engine as the product, in your browser, on a made-up catalog. Change the request or a price and watch which lines pass and which ones stop the quote.
Coming to this demo: paste a customer email as it arrived, and Google's Gemini model turns it into the item lines below. We are building that step now.
1. The customer's request
One item per line: product code | quantity | description. Change it and the result below updates as you type.
2. Matched to the catalog and checked
Each line is looked up in a sample catalog of 6 products. Edit a selling price to see the margin change.
| Code | Catalog item | Qty | Cost | Sell price | Margin | Check |
|---|---|---|---|---|---|---|
| BV-SS-1 | Ball valve, stainless 316, 1 in, threadedSupplier A · min 10 · pack of 1 | 24 | $18.50 | 20.2% | OK | |
| GSK-150-2 | Spiral wound gasket, 2 in, class 150Supplier B · min 50 · pack of 25 | 100 | $2.10 | 16.2% | OK | |
| HN-M12 | Hex nut M12, zinc platedSupplier C · min 100 · pack of 100 | 250 | $0.08 | 23.1% |
| |
| PG-63-10 | Pressure gauge, 63 mm, 0 to 10 barSupplier A · min 5 · pack of 1 | 12 | $9.40 | 4.5% |
| |
| XV-900 | Solenoid valve 24V | 6 | — | — | — | Not in the catalog. A person has to find it. |
Not read as an item, kept for a person to read:
- “Please quote by Friday. Delivery to our Pune warehouse.”
3. Your rules and the decision
- Quote total
- $1,005.30
- Supplier cost
- $786.80
- Profit after freight
- $173.50
- Margin
- 17.3%
Blocked. 2 rule problems must be fixed (quantity or supplier price). 1 line is under your minimum margin; in the product a manager can override that with a written reason.
Sample data only. Nothing you type here is sent or stored. Supplier price dates are checked against 13 Nov 2026.
What is different in the product
- It uses your catalog, sent through the API or a spreadsheet, not this sample one.
- Requests can also arrive as a text PDF or an Excel file.
- Approvals are saved with who approved, when, and the numbers at that moment.
- Going under the minimum margin needs a manager and a written reason.
What is not built yet
- Reading a free-form email. We are building it on Google's Gemini models; today each line must look like the example above.
- Sign-in for a whole team. Early access is set up by hand.
- Reading scanned paper. The file needs real text in it.